We had secured a gig at the biggest nightclub east of the Mississippi River. At least that's how they billed the place. It was an old metal warehouse in Raleigh NC. It brought in the national acts. To get a Wed night in there was an honor. We had auditioned on another band's gear on a Sunday afternoon to get the gig. It was named Music City.
So we get there and start to set up for the job. The manager informs us that the club had a brand new electrical circuit installed that very day for lights. 50a 240v which was perfect for the lights we had. Previously, bands were having to open the panel and tie in in a most dangerous fashion. We often had to do that ourselves in most of the clubs we played. Our lights were awesome. AS I recall, we had 16 one thousand watt Par 64's and a few other lamps and lighting effects.
So Dave has the lights set up, all plugged in, and he plugs into the new 50a range outlet back stage.... flips the breaker on our light control and poof..... half of our lights blow out. The electrician had wired one side of the lighting to the building high leg.... 240v between the phases but 120v to ground on one and 208v on the other. The gig didn't pay enough to cover our lights. It was a live and learn. I had previously told Dave and the crew to always check the voltage, but he was so excited about us playing this huge club he neglected to take 10 seconds to check. Just glad we didn't have our amp rack and mixer plugged into the lighting panel for our band.
Shortly after we played there, the place went bankrupt and closed it's doors. We had bookings that went poof... like our lights.
Last edited by Guitarhacker; 01/13/17 03:40 AM.
You can find my music at:
www.herbhartley.comAdd nothing that adds nothing to the music.
You can make excuses or you can make progress but not both.
The magic you are looking for is in the work you are avoiding.