One possible option that hasn't been mentioned is placing an order for the upgrade while the prices are reduced, but delaying the shipment until a certain build number is released or until some specified future date. The Sales Dept. at PGM was gracious enough to let me do this last year.


Jim
Psalm 33:3 Sing unto him a new song; play skillfully with a loud noise.

BIAB 2018 build 519; Dell Inspiron N4110, Windows 10 64 bit, Intel Core i3-2350m running at 2.29 GHz, Memory: 6 GB DDR3, SDRAM 1MHz